Many Swedish district heating networks still use PR-KIK valves from the Danish manufacturer Brdr. Christensen, produced between 1970 and 1992. Thanks to their robust construction, many of these valves are still fully operational after more than 30 years.

But in many cases, it is not the valve that is the problem – it is the actuator and gearbox
After many years of operation, gearboxes and actuators begin to reach the end of their service life, while spare parts can be difficult or impossible to source. Replacing the entire valve can then be a costly and time-consuming solution – particularly in a district heating network where a shutdown can affect heat supply to hundreds or even thousands of end customers.
For Karlstads Energi, we modernized two existing PR-KIK valves by replacing the old gearboxes and actuators with a modern AUMA solution. Thanks to custom-engineered mounting components, the existing valves could be retained and given a new lease of life.

And the best part? The work was carried out without shutting down the district heating network
This means heat supply can continue while an ageing installation is upgraded with modern, reliable actuator technology.
Key benefits:
✅ Modernization of existing valves – no complete valve replacement required
✅ Extended service life and improved operational reliability
✅ No shutdown of the district heating network during the upgrade
✅ Reduced operational disruption and fewer interventions in existing infrastructure
✅ Cost-effective and future-proof alternative
Do you have older district heating valves where the actuator or gearbox is becoming a challenge?
Get in touch to learn how AUMA can modernize existing installations – without replacing the valve and, in many cases, without shutting down the network.